Casa Del Greg. Now featuring file flooring throughout (mostly), Panoramic front doors and windows, Stylish door handles (every snakes most important accessory) and soon enough, an indoor water feature!!!
So we start with the draw handle.
![](http://i246.photobucket.com/albums/gg83/qakonako/Snake%20Enclosure/P5020007.jpg)
Nothing too flashy, but it matches the ones currently in my room.
![](http://i246.photobucket.com/albums/gg83/qakonako/Snake%20Enclosure/P5020016.jpg)
I had to cheat a little on the other side of the draw face. I could of cut the screws, but I decided two washers and a nut would be sufficient to make the screws the right size.
![](http://i246.photobucket.com/albums/gg83/qakonako/Snake%20Enclosure/P5020008.jpg)
Doors installed and closed... yes, they do work lol.
Dry fitting the luxurious tile floor to test for sizes.
![](http://i246.photobucket.com/albums/gg83/qakonako/Snake%20Enclosure/P5020011.jpg)
Installing the floor. Normally I would use a grooved trowel, but I figured Greg wouldn't complain and I was too lazy to go and get one out. Just means I need to leave it till tomorrow to do any other work.
![](http://i246.photobucket.com/albums/gg83/qakonako/Snake%20Enclosure/P5020013.jpg)
Tiling finished for the most part. All the tile is stuck in except the last one. This one will be siliconed down atop the UTH so that in the event of it breaking, the tile can be easily removed to access the UTH.
![](http://i246.photobucket.com/albums/gg83/qakonako/Snake%20Enclosure/P5020015.jpg)
Doors shut. Floor Laid. Handles attached.
I probably won't have a proper update again until Wednesday when the UTH is set to arrive in the mail.